SINGAPORE: Thousands of panels glinting in the sun stretch into the sea off Singapore, part of the land-scarce city-state’s push to build floating solar farms to cut greenhouse gas.
Silver Line Extension Could Open Early Next Year Phase two of the Silver Line is expected to open in early 2022, according to Metro's general manager. The
The following is a contributed article by Adam Reeve, senior vice president at REsurety.
The deep freeze in Texas seems almost certain to be the top energy story of 2021. The meltdown of the ERCOT power grid had dramatic implications at the individual project level, as the financial performance of each project was driven by the weather conditions at its particular location. For example: iced blades caused some wind projects to shut down near the beginning of the cold weather event, missing out or causing their offtakers to miss out on a potential windfall due to the record-breaking $9,000/MWh pricing that was sustained for days during the event. Meanwhile, some solar projects exceeded expectations during key high-priced hours.